Free project planning
Solar panel truckload calculator
Estimate panels, pallets, and truckloads using packaging dimensions, stack limits, and payload.
Submit your email to receive your result. Example inputs are illustrative; replace them with your project specifications.
Your planning estimate
Your result is locked until your email and project inputs are accepted.
Review and submit the quote form to send your request.
Inputs changed. Calculate again to update the result.
Planning assumptions
Panels = ceiling(MW DC × 1,000,000 ÷ watts), or your known quantity. Pallets = ceiling(panels ÷ panels per pallet). Floor positions use the better of two uniform pallet orientations. Capacity is the lowest of dimensional, payload, and entered pallet limits. Loads = ceiling(pallets ÷ capacity).
Uniform pallet orientations provide a conservative floor plan, not an optimized mixed-orientation loading diagram. Confirm axle distribution, securement, door clearance, equipment type, and manufacturer stacking approval with the carrier. Partial pallets use full packaged dimensions and gross weight.
Worked example
10 MW DC at 550 W requires 18,182 panels. At 36 panels per pallet, that is 506 pallets. The example 88 × 44-inch pallets fit 14 floor positions in the entered trailer at one tier, giving 37 loads. A separately confirmed capacity of 26 pallets would give 20 loads.
Explore transportation, warehousing, and site delivery servicesContinue planning
Solar warehouse space calculator →
Estimate pallet positions and warehouse footprint with approved stacking and aisle allowance.
Solar project delivery scheduler →
Plan daily deliveries and check whether receiving capacity can meet your installation window.
Port-to-project budget calculator →
Build a planning budget from your entered drayage, transload, storage, handling, and inland freight rates.
Solar freight RFQ generator →
Create a downloadable shipment brief and carry your planning estimates into a quote request.