Free project planning
Port-to-project budget calculator
Build a planning budget from your entered drayage, transload, storage, handling, and inland freight rates.
Submit your email to receive your result. Example inputs are illustrative; replace them with your project specifications.
Your planning estimate
Your result is locked until your email and project inputs are accepted.
Review and submit the quote form to send your request.
Inputs changed. Calculate again to update the result.
Planning assumptions
Drayage and transload are charged per container. Storage = pallets × months × monthly pallet rate. Handling = pallets × combined inbound/outbound rate. Inland freight = loads × rate per load. Contingency applies to the entire subtotal. All rates use USD.
Entered rates are assumptions, not live quotes. Add any detention, demurrage, chassis, duties, taxes, insurance, permits, or other exclusions under other charges. Storage is prorated by entered months; actual minimum billing may differ.
Worked example
10 containers at $600 drayage and $300 transload, 260 pallets stored one month at $20 plus $10 handling, and 10 inland loads at $1,500 total $31,800. A 10% contingency produces $34,980.
Explore transportation, warehousing, and site delivery servicesContinue planning
Solar panel truckload calculator →
Estimate panels, pallets, and truckloads using packaging dimensions, stack limits, and payload.
Solar warehouse space calculator →
Estimate pallet positions and warehouse footprint with approved stacking and aisle allowance.
Solar project delivery scheduler →
Plan daily deliveries and check whether receiving capacity can meet your installation window.
Solar freight RFQ generator →
Create a downloadable shipment brief and carry your planning estimates into a quote request.