Solar freight classification reference

Solar Project Logistics: NMFC Codes and Freight Classes for Common Shipments

Find NMFC codes, subitems, density tables, and freight classes for solar panels, batteries, inverters, mounting hardware, and other common project shipments.

Solar panels, inverters, batteries, mounting rails, and electrical accessories can require different freight classifications, even when they are headed to the same project. For developers, construction contractors, installers, and distributors requesting an LTL freight quote, identifying each product and its packaging is the starting point.

This reference groups products that share the same density schedule, then separates the items with their own tables. It covers common solar equipment and installation materials, including the conditions that can change their freight class.

Three terms appear throughout:

  • NMFC item: The classification number describing the product.
  • Subitem: The provision within that item that matches the shipment’s density, packaging, dimensions, or other conditions.
  • Freight class: The class assigned by that provision and used in rating the shipment.

Match the product to its NMFC description before selecting a subitem. Density determines the class only when the applicable item calls for it.

Products that share the standard 13-tier density schedule

The following products use the same density thresholds, subitem numbers, and freight classes when they meet the listed NMFC description and packaging requirements.

ProductNMFC itemApplicable conditions
AC-to-DC power adapters61700Qualifying power packs; in boxes or crates.
MC4-type connectors, connector adapters, terminals, and butt splices61700Qualifying electrical wiring connectors and terminals; in boxes.
PV wiring harnesses and cable assemblies61700In packages. Extension cords are excluded from this provision.
Disconnect switches and circuit breakers61700In boxes. Complete switchboards have separate provisions.
Electrical fuses61700In boxes.
Surge protectors, suppressors, and arresters61700In boxes.
Junction boxes, terminal boxes, and qualifying combiner boxes61700Qualifying boxes and enclosures; in boxes. Equipped combiner assemblies require review of their contents and function.
Battery chargers61700In boxes, crates, or specified authorized packages.
Ground clamps61700In boxes.
Qualifying standalone batteries and cells not listed in the DOT Hazardous Materials Table61700Battery packaging provisions apply. Cabinet- and rack-mounted batteries are excluded.
Solar inverters and microinverters61700, provisionalConfirm the model’s function and whether another description, including controller item 61450, applies.
Aluminum mounting rails and extrusions13120Qualifying lineal shapes or structural forms; in packages. Complete mounting assemblies require separate review.
Aluminum bolts, nuts, and screws13120Qualifying aluminum fasteners; in boxes or drums.
Mounting brackets, clamps, clips, and other qualifying hardware95190, conditionalMaterial, product description, and authorized packaging must match.
Bolts, nuts, screws, and washers95190, conditionalQualifying hardware; generally in boxes or drums. Check specific material provisions, including those for aluminum fasteners.
Electric and revenue meters136950In boxes.
PVC or plastic conduit, pipe, tubing, and fittings156600, conditionalMust meet the applicable plastic article description and packaging provisions, including protection of threaded or belled ends.
Flexible metal electrical conduit50970Qualifying conduit spirally formed from strip metal; in packages.

For these items, use the following schedule. Density is measured in pounds per cubic foot, abbreviated lb/ft³.

Packed density, lb/ft³SubitemFreight class
Under 11400
1 to under 22300
2 to under 43250
4 to under 64175
6 to under 85125
8 to under 106100
10 to under 12792.5
12 to under 15885
15 to under 22.5970
22.5 to under 301065
30 to under 351160
35 to under 501255
50 or more1350

A density exactly at a threshold belongs in the row beginning with that number. For example, exactly 12 lb/ft³ falls under subitem 8, class 85.

This schedule applies to the qualifying products above. Solar panels, controllers, cabinets, and cable trays use the separate schedules below.

Solar panels and PV modules: NMFC 177010

NMFC 177010 covers solar panels, PV cells and modules, solar collectors, and solar water heaters. Both packaging and density determine the class.

The first packaging branch covers boxes or complying NMFC Packages 2149, 2327, 2333, 2340, or 2434. The second covers other authorized packaging subject to Note 177011.

Packed density, lb/ft³Boxes or specified packagesOther authorized packaging
Under 8Subitem 2; class 175Subitem 6; class 250
8 to under 12Subitem 3; class 100Subitem 7; class 125
12 or moreSubitem 4; class 70Subitem 8; class 85

For the second branch, panels must be secured to the pallet, skid, or platform without overhang. Exposed faces and edges need protection suitable for ordinary LTL handling.

A shrink-wrapped pallet does not automatically qualify for the boxed branch. Confirm the actual packaging before selecting the subitem.

Electrical controllers and switchboards: NMFC 61450

Qualifying charge controllers, electrical controllers, switchboards, and switchboard sections use a schedule based on density and the relationship between height and the shortest base dimension.

Charge controllers must meet the description for devices regulating electrical output.

Packed density, lb/ft³Height less than twice the shortest base dimensionHeight at least twice the shortest base dimension
Under 6Subitem 7; class 200Subitem 2; class 300
6 to under 10Subitem 8; class 110Subitem 3; class 150
10 to under 12Subitem 9; class 92.5Subitem 4; class 110
12 or moreSubitem 10; class 70Subitem 5; class 85

Include the pallet, skid, or platform in the height and base measurements. A height exactly twice the shortest base dimension belongs in the right-hand column.

Authorized packaging includes boxes, crates, or Package 2291. Protective packing is required, and articles secured to a pallet or platform must not overhang its deck.

Empty metal electrical cabinets and racks: NMFC 61110

Qualifying empty metal electrical cabinets, enclosures, frames, housings, and racks use a different height-and-density schedule.

Packed density, lb/ft³Height less than twice the shortest base dimensionHeight at least twice the shortest base dimension
Under 6Subitem 6; class 200Subitem 2; class 300
6 to under 10Subitem 7; class 125Subitem 3; class 175
10 or moreSubitem 8; class 85Subitem 4; class 100

Include the pallet or platform in the measurements. Boxes or crates, protective packing, and securement without deck overhang are required.

An empty cabinet and a cabinet containing batteries or other equipment need separate classification consideration. Identify the contents when requesting the quote.

Cable trays, raceways, and cable racks

Cable trays, raceways, troughs, cableways, and cable racks have provisions based on material and length. Some also require density.

Material and NMFC itemArticle lengthDensity, lb/ft³SubitemFreight class
Aluminum, 61220Under 96 inchesUnder 62250
Aluminum, 61220Under 96 inches6 to under 123110
Aluminum, 61220Under 96 inches12 or more470
Aluminum, 6122096 inches or moreUnder 66300
Aluminum, 6122096 inches or more6 or more7100
Steel, 61225Under 96 inchesNo density tier177.5
Steel, 6122596 inches or moreUnder 123125
Steel, 6122596 inches or more12 or more477.5

Exactly 96 inches belongs in the longer-length category.

These articles move in packages, and required installation parts and fittings are included in the provisions. Concrete-embedded steel raceways are excluded.

Batteries, bulk cable, transformers, and other separate class provisions

The following entries use conditions other than the shared 13-tier density schedule.

ProductNMFC itemConditionSubitemFreight class
Standalone batteries or cells listed in the DOT Hazardous Materials Table60680Offered for transportation as Hazard Class 4, 8, or 9170
Standalone batteries or cells listed in the DOT Hazardous Materials Table60680Not offered for transportation as Hazard Class 4, 8, or 9265
Copper wire or cable30310Qualifying specified-length cable1100
Copper wire or cable30310Other than qualifying specified-length cable270
Aluminum electrical cable61150Qualifying specified-length cable185
Aluminum electrical cable61150Other than qualifying specified-length cable260
Transformers and qualifying transformer parts63420In boxes or crates, or doublewall fiberboard containers securely fastened to lift-truck skids or pallets170
Transformers and qualifying transformer parts63420Other authorized packaging285
Copper-clad, copper-coated, or copper-plated steel grounding rods160160In packagesNone50
Qualifying structural iron or steel braces, bracing, brackets, or forms104600Fabricated from material at least 3/16 inch thick and meeting the structural descriptionNone50
Aluminum roof, endwall, or sidewall flashing36520Nested or in strip or roll form; in packagesNone77.5

“None” means the listed class does not have a numbered subitem.

For batteries, the distinction begins with whether the battery is listed in the DOT Hazardous Materials Table. Both rows under 60680 apply to listed batteries. A listed battery that is not offered as Hazard Class 4, 8, or 9 falls under the second row; that fact alone does not move it to 61700.

Battery packaging requirements also apply. Item 60680 specifies boxes, with additional permitted packaging for qualifying storage batteries. Cabinet- and rack-mounted batteries are excluded from the standalone battery provisions under both 60680 and 61700.

For copper and aluminum cable, “specified length” has a particular meaning: cable prepared for a specific installation where damage creates a claim for its entire length. Cutting cable from a reel does not automatically meet that definition.

Qualifying specified-length cable requires identification on the shipping order, bill of lading, and package or container. Wire and cable must also meet the applicable box, crate, or protected-reel requirements.

Products that need individual review

Some common project shipments cannot be assigned a reliable item and class from the product name alone.

ProductDetails needed for classification
Solar inverters and microinvertersManufacturer, model, function, specifications, and packaging. Item 61700 remains provisional until the product description is confirmed.
Equipped combiner boxes and control assembliesInstalled components and the assembly’s function, including whether controller provisions apply.
Cabinet- or rack-mounted batteriesBattery chemistry, cabinet or rack configuration, installed equipment, and how the complete unit is shipped.
Complete battery energy storage systemsSpecifications for the complete system, its components, shipping configuration, dimensions, weight, and battery transportation details.
Complete tracker systems and assembled mounting systemsMaterials, components, degree of assembly, and packaging.
Concrete ballast blocksProduct design, construction, dimensions, weight, and packaging.

Include these products in the quote request even when the classification is unresolved. A specification sheet and clear shipment description give the person preparing the quote something concrete to review.

Calculating packed density

For a pallet, crate, or other handling unit, use its greatest outside dimensions as tendered to the carrier and its complete gross weight. Include the pallet, packaging, and any projections.

When dimensions are in inches:

Cubic feet = length × width × height ÷ 1,728

Density = gross weight in pounds ÷ cubic feet

Keep the unrounded result when selecting the density tier. Rounding a measurement or calculation across a threshold can change the class.

For a hypothetical example, assume a pallet contains only boxed electrical connectors qualifying under NMFC 61700. Its outside dimensions are 48 × 40 × 40 inches, and its gross weight is 600 pounds.

CalculationResult
Volume: 48 × 40 × 40 ÷ 1,728Approximately 44.44 cubic feet
Density: 600 ÷ the unrounded volume13.5 lb/ft³
Applicable shared-table row12 to under 15 lb/ft³
ClassificationNMFC 61700, subitem 8, class 85

That result depends on the product qualifying under 61700. Another commodity at the same density may use a different table.

Measure and document each handling unit. When different commodities share a pallet, the mixed-shipment provisions under Rule 640 need review before weights, volumes, or classes are combined.

What to send for a solar freight quote

A usable quote request describes the freight and the pickup and delivery arrangements.

InformationWhat to provide
Pickup and delivery locationsAddresses and ZIP codes; identify warehouses, distributors, construction sites, or other location types.
TimingFreight-ready date, requested pickup date, required delivery date, and receiving hours.
Product detailsSpecific descriptions, quantities, manufacturer and model where relevant, and whether equipment is assembled or shipped as components.
Handling unitsNumber of pallets, crates, reels, bundles, or other units.
Dimensions and weightGreatest outside length, width, and height, plus gross weight for each handling unit. State the units of measurement.
PackagingBoxes, crates, protected reels, bundled rails, palletized panels, or another configuration. Photos can help explain unusual packaging.
Mixed contentsIdentify which products share each pallet or crate.
ClassificationNMFC item, subitem, and freight class when established. Identify any classification that still needs review.
BatteriesChemistry, transportation classification, and whether standalone, rack-mounted, cabinet-mounted, or installed in equipment.
Handling requirementsWhether freight is stackable and any handling restrictions.
Site delivery requirementsAppointment requirements, site contact, access restrictions, and available unloading equipment. State whether a forklift, crane, or other unloading arrangement will be provided.

For project deliveries, confirm the receiving arrangements before booking. Include any required delivery sequence or installation deadline with the quote request.

Send the shipment details even if you are unsure of the freight class. The product description, packaging, dimensions, and weight provide the basis for reviewing the classification and preparing the quote.

Reference basis: NMF 100-AZ, Supplement 1, using records captured October 29, 2026. Confirm the applicable classification provisions for the shipment date.

Cost planning call

Turn the article into a project-specific operating plan.

Review transportation, warehousing or staging requirements, site receiving constraints, delivery sequencing, and release communication before freight begins moving.

Share the project schedule, equipment profile, origin points, site-readiness risks, and the decisions that are still open.

Project consult

Request a solar logistics planning call

Share the basics. The right follow-up is a logistics conversation, not a generic freight quote.