Solar panels, inverters, batteries, mounting rails, and electrical accessories can require different freight classifications, even when they are headed to the same project. For developers, construction contractors, installers, and distributors requesting an LTL freight quote, identifying each product and its packaging is the starting point.
This reference groups products that share the same density schedule, then separates the items with their own tables. It covers common solar equipment and installation materials, including the conditions that can change their freight class.
Three terms appear throughout:
- NMFC item: The classification number describing the product.
- Subitem: The provision within that item that matches the shipment’s density, packaging, dimensions, or other conditions.
- Freight class: The class assigned by that provision and used in rating the shipment.
Match the product to its NMFC description before selecting a subitem. Density determines the class only when the applicable item calls for it.
Products that share the standard 13-tier density schedule
The following products use the same density thresholds, subitem numbers, and freight classes when they meet the listed NMFC description and packaging requirements.
| Product | NMFC item | Applicable conditions |
|---|---|---|
| AC-to-DC power adapters | 61700 | Qualifying power packs; in boxes or crates. |
| MC4-type connectors, connector adapters, terminals, and butt splices | 61700 | Qualifying electrical wiring connectors and terminals; in boxes. |
| PV wiring harnesses and cable assemblies | 61700 | In packages. Extension cords are excluded from this provision. |
| Disconnect switches and circuit breakers | 61700 | In boxes. Complete switchboards have separate provisions. |
| Electrical fuses | 61700 | In boxes. |
| Surge protectors, suppressors, and arresters | 61700 | In boxes. |
| Junction boxes, terminal boxes, and qualifying combiner boxes | 61700 | Qualifying boxes and enclosures; in boxes. Equipped combiner assemblies require review of their contents and function. |
| Battery chargers | 61700 | In boxes, crates, or specified authorized packages. |
| Ground clamps | 61700 | In boxes. |
| Qualifying standalone batteries and cells not listed in the DOT Hazardous Materials Table | 61700 | Battery packaging provisions apply. Cabinet- and rack-mounted batteries are excluded. |
| Solar inverters and microinverters | 61700, provisional | Confirm the model’s function and whether another description, including controller item 61450, applies. |
| Aluminum mounting rails and extrusions | 13120 | Qualifying lineal shapes or structural forms; in packages. Complete mounting assemblies require separate review. |
| Aluminum bolts, nuts, and screws | 13120 | Qualifying aluminum fasteners; in boxes or drums. |
| Mounting brackets, clamps, clips, and other qualifying hardware | 95190, conditional | Material, product description, and authorized packaging must match. |
| Bolts, nuts, screws, and washers | 95190, conditional | Qualifying hardware; generally in boxes or drums. Check specific material provisions, including those for aluminum fasteners. |
| Electric and revenue meters | 136950 | In boxes. |
| PVC or plastic conduit, pipe, tubing, and fittings | 156600, conditional | Must meet the applicable plastic article description and packaging provisions, including protection of threaded or belled ends. |
| Flexible metal electrical conduit | 50970 | Qualifying conduit spirally formed from strip metal; in packages. |
For these items, use the following schedule. Density is measured in pounds per cubic foot, abbreviated lb/ft³.
| Packed density, lb/ft³ | Subitem | Freight class |
|---|---|---|
| Under 1 | 1 | 400 |
| 1 to under 2 | 2 | 300 |
| 2 to under 4 | 3 | 250 |
| 4 to under 6 | 4 | 175 |
| 6 to under 8 | 5 | 125 |
| 8 to under 10 | 6 | 100 |
| 10 to under 12 | 7 | 92.5 |
| 12 to under 15 | 8 | 85 |
| 15 to under 22.5 | 9 | 70 |
| 22.5 to under 30 | 10 | 65 |
| 30 to under 35 | 11 | 60 |
| 35 to under 50 | 12 | 55 |
| 50 or more | 13 | 50 |
A density exactly at a threshold belongs in the row beginning with that number. For example, exactly 12 lb/ft³ falls under subitem 8, class 85.
This schedule applies to the qualifying products above. Solar panels, controllers, cabinets, and cable trays use the separate schedules below.
Solar panels and PV modules: NMFC 177010
NMFC 177010 covers solar panels, PV cells and modules, solar collectors, and solar water heaters. Both packaging and density determine the class.
The first packaging branch covers boxes or complying NMFC Packages 2149, 2327, 2333, 2340, or 2434. The second covers other authorized packaging subject to Note 177011.
| Packed density, lb/ft³ | Boxes or specified packages | Other authorized packaging |
|---|---|---|
| Under 8 | Subitem 2; class 175 | Subitem 6; class 250 |
| 8 to under 12 | Subitem 3; class 100 | Subitem 7; class 125 |
| 12 or more | Subitem 4; class 70 | Subitem 8; class 85 |
For the second branch, panels must be secured to the pallet, skid, or platform without overhang. Exposed faces and edges need protection suitable for ordinary LTL handling.
A shrink-wrapped pallet does not automatically qualify for the boxed branch. Confirm the actual packaging before selecting the subitem.
Electrical controllers and switchboards: NMFC 61450
Qualifying charge controllers, electrical controllers, switchboards, and switchboard sections use a schedule based on density and the relationship between height and the shortest base dimension.
Charge controllers must meet the description for devices regulating electrical output.
| Packed density, lb/ft³ | Height less than twice the shortest base dimension | Height at least twice the shortest base dimension |
|---|---|---|
| Under 6 | Subitem 7; class 200 | Subitem 2; class 300 |
| 6 to under 10 | Subitem 8; class 110 | Subitem 3; class 150 |
| 10 to under 12 | Subitem 9; class 92.5 | Subitem 4; class 110 |
| 12 or more | Subitem 10; class 70 | Subitem 5; class 85 |
Include the pallet, skid, or platform in the height and base measurements. A height exactly twice the shortest base dimension belongs in the right-hand column.
Authorized packaging includes boxes, crates, or Package 2291. Protective packing is required, and articles secured to a pallet or platform must not overhang its deck.
Empty metal electrical cabinets and racks: NMFC 61110
Qualifying empty metal electrical cabinets, enclosures, frames, housings, and racks use a different height-and-density schedule.
| Packed density, lb/ft³ | Height less than twice the shortest base dimension | Height at least twice the shortest base dimension |
|---|---|---|
| Under 6 | Subitem 6; class 200 | Subitem 2; class 300 |
| 6 to under 10 | Subitem 7; class 125 | Subitem 3; class 175 |
| 10 or more | Subitem 8; class 85 | Subitem 4; class 100 |
Include the pallet or platform in the measurements. Boxes or crates, protective packing, and securement without deck overhang are required.
An empty cabinet and a cabinet containing batteries or other equipment need separate classification consideration. Identify the contents when requesting the quote.
Cable trays, raceways, and cable racks
Cable trays, raceways, troughs, cableways, and cable racks have provisions based on material and length. Some also require density.
| Material and NMFC item | Article length | Density, lb/ft³ | Subitem | Freight class |
|---|---|---|---|---|
| Aluminum, 61220 | Under 96 inches | Under 6 | 2 | 250 |
| Aluminum, 61220 | Under 96 inches | 6 to under 12 | 3 | 110 |
| Aluminum, 61220 | Under 96 inches | 12 or more | 4 | 70 |
| Aluminum, 61220 | 96 inches or more | Under 6 | 6 | 300 |
| Aluminum, 61220 | 96 inches or more | 6 or more | 7 | 100 |
| Steel, 61225 | Under 96 inches | No density tier | 1 | 77.5 |
| Steel, 61225 | 96 inches or more | Under 12 | 3 | 125 |
| Steel, 61225 | 96 inches or more | 12 or more | 4 | 77.5 |
Exactly 96 inches belongs in the longer-length category.
These articles move in packages, and required installation parts and fittings are included in the provisions. Concrete-embedded steel raceways are excluded.
Batteries, bulk cable, transformers, and other separate class provisions
The following entries use conditions other than the shared 13-tier density schedule.
| Product | NMFC item | Condition | Subitem | Freight class |
|---|---|---|---|---|
| Standalone batteries or cells listed in the DOT Hazardous Materials Table | 60680 | Offered for transportation as Hazard Class 4, 8, or 9 | 1 | 70 |
| Standalone batteries or cells listed in the DOT Hazardous Materials Table | 60680 | Not offered for transportation as Hazard Class 4, 8, or 9 | 2 | 65 |
| Copper wire or cable | 30310 | Qualifying specified-length cable | 1 | 100 |
| Copper wire or cable | 30310 | Other than qualifying specified-length cable | 2 | 70 |
| Aluminum electrical cable | 61150 | Qualifying specified-length cable | 1 | 85 |
| Aluminum electrical cable | 61150 | Other than qualifying specified-length cable | 2 | 60 |
| Transformers and qualifying transformer parts | 63420 | In boxes or crates, or doublewall fiberboard containers securely fastened to lift-truck skids or pallets | 1 | 70 |
| Transformers and qualifying transformer parts | 63420 | Other authorized packaging | 2 | 85 |
| Copper-clad, copper-coated, or copper-plated steel grounding rods | 160160 | In packages | None | 50 |
| Qualifying structural iron or steel braces, bracing, brackets, or forms | 104600 | Fabricated from material at least 3/16 inch thick and meeting the structural description | None | 50 |
| Aluminum roof, endwall, or sidewall flashing | 36520 | Nested or in strip or roll form; in packages | None | 77.5 |
“None” means the listed class does not have a numbered subitem.
For batteries, the distinction begins with whether the battery is listed in the DOT Hazardous Materials Table. Both rows under 60680 apply to listed batteries. A listed battery that is not offered as Hazard Class 4, 8, or 9 falls under the second row; that fact alone does not move it to 61700.
Battery packaging requirements also apply. Item 60680 specifies boxes, with additional permitted packaging for qualifying storage batteries. Cabinet- and rack-mounted batteries are excluded from the standalone battery provisions under both 60680 and 61700.
For copper and aluminum cable, “specified length” has a particular meaning: cable prepared for a specific installation where damage creates a claim for its entire length. Cutting cable from a reel does not automatically meet that definition.
Qualifying specified-length cable requires identification on the shipping order, bill of lading, and package or container. Wire and cable must also meet the applicable box, crate, or protected-reel requirements.
Products that need individual review
Some common project shipments cannot be assigned a reliable item and class from the product name alone.
| Product | Details needed for classification |
|---|---|
| Solar inverters and microinverters | Manufacturer, model, function, specifications, and packaging. Item 61700 remains provisional until the product description is confirmed. |
| Equipped combiner boxes and control assemblies | Installed components and the assembly’s function, including whether controller provisions apply. |
| Cabinet- or rack-mounted batteries | Battery chemistry, cabinet or rack configuration, installed equipment, and how the complete unit is shipped. |
| Complete battery energy storage systems | Specifications for the complete system, its components, shipping configuration, dimensions, weight, and battery transportation details. |
| Complete tracker systems and assembled mounting systems | Materials, components, degree of assembly, and packaging. |
| Concrete ballast blocks | Product design, construction, dimensions, weight, and packaging. |
Include these products in the quote request even when the classification is unresolved. A specification sheet and clear shipment description give the person preparing the quote something concrete to review.
Calculating packed density
For a pallet, crate, or other handling unit, use its greatest outside dimensions as tendered to the carrier and its complete gross weight. Include the pallet, packaging, and any projections.
When dimensions are in inches:
Cubic feet = length × width × height ÷ 1,728
Density = gross weight in pounds ÷ cubic feet
Keep the unrounded result when selecting the density tier. Rounding a measurement or calculation across a threshold can change the class.
For a hypothetical example, assume a pallet contains only boxed electrical connectors qualifying under NMFC 61700. Its outside dimensions are 48 × 40 × 40 inches, and its gross weight is 600 pounds.
| Calculation | Result |
|---|---|
| Volume: 48 × 40 × 40 ÷ 1,728 | Approximately 44.44 cubic feet |
| Density: 600 ÷ the unrounded volume | 13.5 lb/ft³ |
| Applicable shared-table row | 12 to under 15 lb/ft³ |
| Classification | NMFC 61700, subitem 8, class 85 |
That result depends on the product qualifying under 61700. Another commodity at the same density may use a different table.
Measure and document each handling unit. When different commodities share a pallet, the mixed-shipment provisions under Rule 640 need review before weights, volumes, or classes are combined.
What to send for a solar freight quote
A usable quote request describes the freight and the pickup and delivery arrangements.
| Information | What to provide |
|---|---|
| Pickup and delivery locations | Addresses and ZIP codes; identify warehouses, distributors, construction sites, or other location types. |
| Timing | Freight-ready date, requested pickup date, required delivery date, and receiving hours. |
| Product details | Specific descriptions, quantities, manufacturer and model where relevant, and whether equipment is assembled or shipped as components. |
| Handling units | Number of pallets, crates, reels, bundles, or other units. |
| Dimensions and weight | Greatest outside length, width, and height, plus gross weight for each handling unit. State the units of measurement. |
| Packaging | Boxes, crates, protected reels, bundled rails, palletized panels, or another configuration. Photos can help explain unusual packaging. |
| Mixed contents | Identify which products share each pallet or crate. |
| Classification | NMFC item, subitem, and freight class when established. Identify any classification that still needs review. |
| Batteries | Chemistry, transportation classification, and whether standalone, rack-mounted, cabinet-mounted, or installed in equipment. |
| Handling requirements | Whether freight is stackable and any handling restrictions. |
| Site delivery requirements | Appointment requirements, site contact, access restrictions, and available unloading equipment. State whether a forklift, crane, or other unloading arrangement will be provided. |
For project deliveries, confirm the receiving arrangements before booking. Include any required delivery sequence or installation deadline with the quote request.
Send the shipment details even if you are unsure of the freight class. The product description, packaging, dimensions, and weight provide the basis for reviewing the classification and preparing the quote.
Reference basis: NMF 100-AZ, Supplement 1, using records captured October 29, 2026. Confirm the applicable classification provisions for the shipment date.